Electric Vehicle Charging Station, Araku Valley, Ravvalaguda
Electric Vehicle Charging Station is an EV charging location at Araku Valley, Ravvalaguda, Andhra Pradesh, with Type 2 AC across 1 charge point rated up to 7.4 kW.
- ConnectorsType 2 AC
- Charge points1
- Rated output7.4 kW
Where Electric Vehicle Charging Station is
Vizag Main Road, Araku Valley, Ravvalaguda, Andhra Pradesh 531149, India
| Field | Value |
|---|---|
| Locality | Araku Valley |
| City | Ravvalaguda |
| State | Andhra Pradesh |
| Coordinates | 18.31371, 82.89374 |
Connectors and power at Electric Vehicle Charging Station
| Connector | Current | Typical use |
|---|---|---|
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 7.4 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Electric Vehicle Charging Station
Time to take a battery from 10 to 80 per cent at the 7.4 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 7.4 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 2 hr 50 min |
| 45 kWh | 31.5 kWh | 4 hr 15 min |
| 60 kWh | 42 kWh | 5 hr 40 min |
Charging around Electric Vehicle Charging Station
2 other charging locations are mapped within 5 km of Electric Vehicle Charging Station, 2 of them with DC fast charging. Electric Vehicle Charging Station has no DC fast charging recorded; the closest location that does is Hindustan Petroleum Corporation Limited Charging Station, 1.0 km south-east.
It is the only charging location Zevvy has mapped in Ravvalaguda.
Which cars can charge at Electric Vehicle Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Electric Vehicle Charging Station
- Hindustan Petroleum Corporation Limited Charging Station8V4X+VR8, Araku Valley, Littiguda, Andhra Pradesh 531149, India1.0 km away · south-east
- Hindustan Petroleum Corporation Limited Charging Station8V9J+VXJ, Sarabhaguda, Andhra Pradesh 531149, India1.4 km away · north-west
- Tata Power Charging Station62FM+GM6, Araku - Visakhapatnam Rd, Ninnimamidi, Visakhapatnam, Andhra Pradesh 535145, India17.9 km away · south-east
Plan a trip through Ravvalaguda
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Electric Vehicle Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Electric Vehicle Charging Station have?
- Type 2 AC (AC) across 1 charge point, rated up to 7.4 kW.
- Is Electric Vehicle Charging Station a fast charger?
- No. Only AC charging is recorded at Electric Vehicle Charging Station, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Hindustan Petroleum Corporation Limited Charging Station, 1.0 km away.
- How long does it take to charge at Electric Vehicle Charging Station?
- At its rated 7.4 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 4 hr 15 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Electric Vehicle Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Electric Vehicle Charging Station?
- Any car with Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total. This is an AC-only location, so charging will be slow.
- What is the nearest alternative to Electric Vehicle Charging Station?
- Hindustan Petroleum Corporation Limited Charging Station, 1.0 km away, with CCS2. 2 further alternatives are listed on this page.
