Zevvy Plan a route

Intertie Charging Station, 292 Redstone Blvd, Redstone Historic District, CO

Intertie Charging Station is an EV charging location at 292 Redstone Blvd, Redstone Historic District, Colorado, with CCS1 and CHAdeMO across 2 charge points rated up to 75 kW.

Where Intertie Charging Station is

292 Redstone Blvd, Redstone Historic District, CO 81623, USA

Location detail for Intertie Charging Station
FieldValue
Street292 Redstone Blvd
CityRedstone Historic District
StateColorado
ZIP code81623
Coordinates39.18296, -107.23768

Connectors and power at Intertie Charging Station

Connector types recorded at Intertie Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop
CHAdeMODCFast charging on a highway stop

The highest output recorded for this location is 75 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Intertie Charging Station

Time to take a battery from 10 to 80 per cent at the 75 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 75 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Intertie Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh34 min
80 kWh56 kWh45 min
100 kWh70 kWh56 min

Charging around Intertie Charging Station

No other charging location is mapped within 3 mi of Intertie Charging Station, so it is worth checking before you depend on it.

It is the only charging location Zevvy has mapped in Redstone Historic District.

Which cars can charge at Intertie Charging Station

Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Intertie Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Intertie Charging Station

Plan a trip through Redstone Historic District

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Intertie Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Intertie Charging Station have?
CCS1 (DC fast) and CHAdeMO (DC fast) across 2 charge points, rated up to 75 kW.
Is Intertie Charging Station a fast charger?
Yes. It has DC fast charging (CCS1 and CHAdeMO), rated up to 75 kW.
How long does it take to charge at Intertie Charging Station?
At its rated 75 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 45 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Intertie Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Intertie Charging Station?
Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Intertie Charging Station?
AmpUp Charging Station, 14.8 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near Intertie Charging Station