Zevvy Plan a route

Allen Construction EV Charging Station, 201 N Milpas St, Santa Barbara, CA

Allen Construction is an EV charging location at 201 N Milpas St, Santa Barbara, California, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.

Where Allen Construction is

201 N Milpas St, Santa Barbara, CA, 93103

Location detail for Allen Construction
FieldValue
Street201 N Milpas St
CitySanta Barbara
StateCalifornia
Coordinates34.42343, -119.68182

Connectors and power at Allen Construction

Connector types recorded at Allen Construction
ConnectorCurrentTypical use
J1772 (Type 1)ACSlower top-up over a longer stay

The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Allen Construction

Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Allen Construction
Battery sizeEnergy addedMinimum time
60 kWh42 kWh11 hr 20 min
80 kWh56 kWh15 hr 10 min
100 kWh70 kWh18 hr 55 min

Charging around Allen Construction

37 other charging locations are mapped within 3 mi of Allen Construction, 6 of them with DC fast charging. Allen Construction has no DC fast charging recorded; the closest location that does is Tesla Supercharger, 0.9 mi west.

Allen Construction is one of 56 charging locations Zevvy has mapped in Santa Barbara; 8 of them have DC fast charging. 54 locations in Santa Barbara have a higher recorded output than its 3.7 kW.

Which cars can charge at Allen Construction

Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Allen Construction, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Allen Construction

Plan a trip through Santa Barbara

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Allen Construction working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Allen Construction have?
J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
Is Allen Construction a fast charger?
No. Only AC charging is recorded at Allen Construction, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Tesla Supercharger, 0.9 mi away.
How long does it take to charge at Allen Construction?
At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at Allen Construction?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Allen Construction?
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
What is the nearest alternative to Allen Construction?
ChargePoint Charging Station, 0.5 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near Allen Construction