Zevvy Plan a route

Murdock Ford EV Charging Station, 985 Summit Ridge Pkwy, Santaquin, UT

Murdock Ford is an EV charging location at 985 Summit Ridge Pkwy, Santaquin, Utah, with CCS1 across 1 charge point rated up to 50 kW.

Where Murdock Ford is

985 Summit Ridge Pkwy, Santaquin, UT, 84655

Location detail for Murdock Ford
FieldValue
Street985 Summit Ridge Pkwy
CitySantaquin
StateUtah
Coordinates39.95108, -111.80650

Connectors and power at Murdock Ford

Connector types recorded at Murdock Ford
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Murdock Ford

Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Murdock Ford
Battery sizeEnergy addedMinimum time
60 kWh42 kWh50 min
80 kWh56 kWh1 hr 5 min
100 kWh70 kWh1 hr 25 min

Charging around Murdock Ford

No other charging location is mapped within 3 mi of Murdock Ford, so it is worth checking before you depend on it.

It is the only charging location Zevvy has mapped in Santaquin.

Which cars can charge at Murdock Ford

Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Murdock Ford, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Murdock Ford

Plan a trip through Santaquin

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Murdock Ford working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Murdock Ford have?
CCS1 (DC fast) across 1 charge point, rated up to 50 kW.
Is Murdock Ford a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 50 kW.
How long does it take to charge at Murdock Ford?
At its rated 50 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Murdock Ford?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Murdock Ford?
Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Murdock Ford?
ChargePoint Charging Station, 5.8 mi away, with J1772 (Type 1). 3 further alternatives are listed on this page.

More charging near Murdock Ford