Electric Vehicle Charging Station, Ayodhya, Shanawa
Electric Vehicle Charging Station is an EV charging location at Ayodhya, Shanawa, Uttar Pradesh, with CCS2 across 2 charge points rated up to 60 kW.
- ConnectorsCCS2
- Charge points2
- Rated output60 kW
Where Electric Vehicle Charging Station is
Darshan Nagar near Police Chauki Ayodhya 224135, Ayodhya - Darshan Nagar Rd, near Police chauki, Ayodhya, Shanawa, Uttar Pradesh 224135, India
| Field | Value |
|---|---|
| Locality | Ayodhya |
| City | Shanawa |
| State | Uttar Pradesh |
| Coordinates | 26.75299, 82.21146 |
Connectors and power at Electric Vehicle Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Electric Vehicle Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around Electric Vehicle Charging Station
2 other charging locations are mapped within 5 km of Electric Vehicle Charging Station, 2 of them with DC fast charging.
Electric Vehicle Charging Station is one of 2 charging locations Zevvy has mapped in Shanawa, and one of 2 with DC fast charging. No location in Shanawa has a higher recorded output than its 60 kW.
Which cars can charge at Electric Vehicle Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Electric Vehicle Charging Station
- Tata Power Charging StationAshapur Village, Darshan Nagar, Q626+VVW, Deokali, Faizabad, Shanawa, Uttar Pradesh 224135, India0.1 km away · south-east
- Adani Charging StationMRF Centre, near Kashiram Colony, Karsewakpuram, Ayodhya, Faizabad, Uttar Pradesh 224123, India4.3 km away · north
- ChargeZone Charging StationGround Floor, nearby RBS Hotel And Lawn, I.E.T. Campus, Faizabad, Uttar Pradesh 224133, India5.3 km away · west
- BPCL Charging StationQ6XC+W6P, AYODYA BYEPASS, AYODYA BYEPA, Karsewakpuram, Ayodhya, Uttar Pradesh 272129, India5.3 km away · north
- Adani Charging StationParyatan Vibhag Parking, Ram Katha Park, Manjha Kala, Ayodhya, Uttar Pradesh 272129, India6.0 km away · north
Plan a trip through Shanawa
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Electric Vehicle Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Electric Vehicle Charging Station have?
- CCS2 (DC fast) across 2 charge points, rated up to 60 kW.
- Is Electric Vehicle Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at Electric Vehicle Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Electric Vehicle Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Electric Vehicle Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Electric Vehicle Charging Station?
- Tata Power Charging Station, 0.1 km away, with CCS2. 4 further alternatives are listed on this page.
