7Charge, 1901 Garibaldi Way, Squamish, BC
7Charge is a 7-Charge (7-Eleven) charging location at 1901 Garibaldi Way, Squamish, British Columbia, with CHAdeMO and CCS1 across 2 charge points rated up to 180 kW.
- ConnectorsCHAdeMO, CCS1
- Charge points2
- Rated output180 kW
- Network7-Charge (7-Eleven)
Where 7Charge is
1901 Garibaldi Way, Squamish, BC V0N 1T0, Canada
| Field | Value |
|---|---|
| Street | 1901 Garibaldi Way |
| City | Squamish |
| Province | British Columbia |
| Postal code | V0N 1T0 |
| Coordinates | 49.74107, -123.13366 |
| Network operator | 7-Charge (7-Eleven) |
Connectors and power at 7Charge
| Connector | Current | Typical use |
|---|---|---|
| CHAdeMO | DC | Fast charging on a highway stop |
| CCS1 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 180 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at 7Charge
Time to take a battery from 10 to 80 per cent at the 180 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 180 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 14 min |
| 80 kWh | 56 kWh | 19 min |
| 100 kWh | 70 kWh | 23 min |
Charging around 7Charge
12 other charging locations are mapped within 5 km of 7Charge, 7 of them with DC fast charging.
7Charge is one of 15 charging locations Zevvy has mapped in Squamish, and one of 9 with DC fast charging. 2 locations in Squamish have a higher recorded output than its 180 kW.
Which cars can charge at 7Charge
Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for 7Charge, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to 7Charge
- 7-Eleven Canada1901 Garibaldi Highlands, Squamish, BC, V0N 1T00.0 km away · north-west
- Electrify Canada Charging Station40270 Glenalder Pl, Squamish, BC V8B 0G2, Canada0.3 km away · south
- SWTCH Charging Station40310 Government Rd, Squamish, BC V8B 0G6, Canada0.3 km away · south-west
- Tesla Supercharger40167 Glenalder Pl, Squamish, BC V8B 0G2, Canada0.5 km away · south
- FLO Charging Station1009 Centennial Wy, Squamish, BC V8B 0E2, Canada1.8 km away · south
Plan a trip through Squamish
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is 7Charge working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does 7Charge have?
- CHAdeMO (DC fast) and CCS1 (DC fast) across 2 charge points, rated up to 180 kW.
- Is 7Charge a fast charger?
- Yes. It has DC fast charging (CHAdeMO and CCS1), rated up to 180 kW.
- How long does it take to charge at 7Charge?
- At its rated 180 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 19 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at 7Charge?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. 7-Charge (7-Eleven) sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at 7Charge?
- Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
- What is the nearest alternative to 7Charge?
- 7-Eleven Canada, 0.0 km away, with CCS1. 4 further alternatives are listed on this page.
