Zevvy Plan a route

City of Vancouver EV Charging Station, 900 Heatley Ave, Vancouver, BC

City of Vancouver is an EV charging location at 900 Heatley Ave, Vancouver, British Columbia, with CCS1 across 1 charge point rated up to 50 kW.

Where City of Vancouver is

900 Heatley Ave, Vancouver, BC, V6A 3S7

Location detail for City of Vancouver
FieldValue
Street900 Heatley Ave
CityVancouver
ProvinceBritish Columbia
Coordinates49.27584, -123.08964

Connectors and power at City of Vancouver

Connector types recorded at City of Vancouver
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at City of Vancouver

Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at City of Vancouver
Battery sizeEnergy addedMinimum time
60 kWh42 kWh50 min
80 kWh56 kWh1 hr 5 min
100 kWh70 kWh1 hr 25 min

Charging around City of Vancouver

224 other charging locations are mapped within 5 km of City of Vancouver, 27 of them with DC fast charging.

City of Vancouver is one of 273 charging locations Zevvy has mapped in Vancouver, and one of 40 with DC fast charging. 24 locations in Vancouver have a higher recorded output than its 50 kW.

Which cars can charge at City of Vancouver

Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for City of Vancouver, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to City of Vancouver

Plan a trip through Vancouver

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is City of Vancouver working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does City of Vancouver have?
CCS1 (DC fast) across 1 charge point, rated up to 50 kW.
Is City of Vancouver a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 50 kW.
How long does it take to charge at City of Vancouver?
At its rated 50 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at City of Vancouver?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at City of Vancouver?
Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to City of Vancouver?
COASTAL FORD CPF50-2-VAN, 0.4 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near City of Vancouver