Grappe Industrielle des Véhicules Électriques et Intelligents EV Charging Station, 1975 Chemin de L'Énergie, Varennes, QC
Grappe Industrielle des Véhicules Électriques et Intelligents is an EV charging location at 1975 Chemin de L'Énergie, Varennes, Quebec, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
Where Grappe Industrielle des Véhicules Électriques et Intelligents is
1975 Chemin de L'Énergie, Varennes, QC, J3X 1P7
| Field | Value |
|---|---|
| Street | 1975 Chemin de L'Énergie |
| City | Varennes |
| Province | Quebec |
| Coordinates | 45.63909, -73.37481 |
Connectors and power at Grappe Industrielle des Véhicules Électriques et Intelligents
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Grappe Industrielle des Véhicules Électriques et Intelligents
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Grappe Industrielle des Véhicules Électriques et Intelligents
11 other charging locations are mapped within 5 km of Grappe Industrielle des Véhicules Électriques et Intelligents, none of them with DC fast charging. Grappe Industrielle des Véhicules Électriques et Intelligents has no DC fast charging recorded; the closest location that does is EcoCharge Charging Station, 5.5 km north-west.
Grappe Industrielle des Véhicules Électriques et Intelligents is one of 21 charging locations Zevvy has mapped in Varennes; 1 of them has DC fast charging. 3 locations in Varennes have a higher recorded output than its 3.7 kW.
Which cars can charge at Grappe Industrielle des Véhicules Électriques et Intelligents
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Grappe Industrielle des Véhicules Électriques et Intelligents, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Grappe Industrielle des Véhicules Électriques et Intelligents
- FLO Charging Station245 Rue Jean Coutu, Varennes, QC J3X 0E1, Canada0.8 km away · south
- ChargePoint Charging Station245 Rue Jean Coutu, Varennes, QC J3X 0E1, Canada0.9 km away · south
- Electric Circuit Charging Station200 Rue Jean Coutu, Varennes, QC J3X 0E1, Canada1.0 km away · south-west
- Sun Country Highway Charging Station200 Rue Jean Coutu, Varennes, QC J3X 0E1, Canada1.0 km away · south-west
- FLO Charging Station1459 Bd Lionel-Boulet, Varennes, QC J3X 1P7, Canada1.5 km away · south-west
Plan a trip through Varennes
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Grappe Industrielle des Véhicules Électriques et Intelligents working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Grappe Industrielle des Véhicules Électriques et Intelligents have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Grappe Industrielle des Véhicules Électriques et Intelligents a fast charger?
- No. Only AC charging is recorded at Grappe Industrielle des Véhicules Électriques et Intelligents, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is EcoCharge Charging Station, 5.5 km away.
- How long does it take to charge at Grappe Industrielle des Véhicules Électriques et Intelligents?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Grappe Industrielle des Véhicules Électriques et Intelligents?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Grappe Industrielle des Véhicules Électriques et Intelligents?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Grappe Industrielle des Véhicules Électriques et Intelligents?
- FLO Charging Station, 0.8 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.
