Zevvy Plan a route

Electric Vehicle Charging Station, 419 Dakota Ave, Wahpeton, ND

Electric Vehicle Charging Station is an EV charging location at 419 Dakota Ave, Wahpeton, North Dakota, with J1772 (Type 1) across 1 charge point rated up to 11.5 kW.

Where Electric Vehicle Charging Station is

419 Dakota Ave, Wahpeton, ND 58075, USA

Location detail for Electric Vehicle Charging Station
FieldValue
Street419 Dakota Ave
CityWahpeton
StateNorth Dakota
ZIP code58075
Coordinates46.26343, -96.60678

Connectors and power at Electric Vehicle Charging Station

Connector types recorded at Electric Vehicle Charging Station
ConnectorCurrentTypical use
J1772 (Type 1)ACSlower top-up over a longer stay

The highest output recorded for this location is 11.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Electric Vehicle Charging Station

Time to take a battery from 10 to 80 per cent at the 11.5 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 11.5 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Electric Vehicle Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh3 hr 40 min
80 kWh56 kWh4 hr 50 min
100 kWh70 kWh6 hr 5 min

Charging around Electric Vehicle Charging Station

No other charging location is mapped within 3 mi of Electric Vehicle Charging Station, so it is worth checking before you depend on it. Electric Vehicle Charging Station has no DC fast charging recorded, and no location with it is mapped within 16 mi.

It is the only charging location Zevvy has mapped in Wahpeton.

Which cars can charge at Electric Vehicle Charging Station

Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Plan a trip through Wahpeton

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Electric Vehicle Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Electric Vehicle Charging Station have?
J1772 (Type 1) (AC) across 1 charge point, rated up to 11.5 kW.
Is Electric Vehicle Charging Station a fast charger?
No. Only AC charging is recorded at Electric Vehicle Charging Station, which suits a longer stay rather than a quick highway stop. No DC fast charger is mapped within 16 mi.
How long does it take to charge at Electric Vehicle Charging Station?
At its rated 11.5 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 4 hr 50 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at Electric Vehicle Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Electric Vehicle Charging Station?
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.

More charging near Electric Vehicle Charging Station