Electric Vehicle Charging Station, Surur, Wele
Electric Vehicle Charging Station is an EV charging location at Surur, Wele, Maharashtra, with CCS2 across 3 charge points rated up to 150 kW.
- ConnectorsCCS2
- Charge points3
- Rated output150 kW
Where Electric Vehicle Charging Station is
XXPQ+WM4, National Highway, 4, Surur, Wele, Maharashtra 415517, India
| Field | Value |
|---|---|
| Locality | Surur |
| City | Wele |
| State | Maharashtra |
| Coordinates | 17.98743, 73.98942 |
Connectors and power at Electric Vehicle Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 150 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Electric Vehicle Charging Station
Time to take a battery from 10 to 80 per cent at the 150 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 150 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 8 min |
| 45 kWh | 31.5 kWh | 13 min |
| 60 kWh | 42 kWh | 17 min |
Charging around Electric Vehicle Charging Station
5 other charging locations are mapped within 5 km of Electric Vehicle Charging Station, 5 of them with DC fast charging.
Electric Vehicle Charging Station is one of 5 charging locations Zevvy has mapped in Wele, and one of 5 with DC fast charging. No location in Wele has a higher recorded output than its 150 kW.
Which cars can charge at Electric Vehicle Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Electric Vehicle Charging Station
- Hyundai EV Charging StationOscarwadi Misal, AH47, Highway Touch, NH-4, Pune - Kolhapur Highway, Wele Oscarwadi, Wele, Maharashtra 415517, India0.0 km away · north
- Zeon Charging StationHotel Aashirwad Inn, Koyana Nagar, Wele, Maharashtra 415517, India0.4 km away · north
- ChargeZone x TATA.ev MegaChargerGround Floor, Pune - Satara Rd, nearby Hotel Sai Park Inn, Wai, Surur, Maharashtra 415517, India1.1 km away · south
- Gentari Charging Station2X2V+MRC, Khambatki Ghat, Wele, Maharashtra 415517, India1.7 km away · north
- Hotel Aram RegencyN H 48, Khambatki Ghat, Wele, Maharashtra , 4155171.8 km away · north
Plan a trip through Wele
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Electric Vehicle Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Electric Vehicle Charging Station have?
- CCS2 (DC fast) across 3 charge points, rated up to 150 kW.
- Is Electric Vehicle Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 150 kW.
- How long does it take to charge at Electric Vehicle Charging Station?
- At its rated 150 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 13 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Electric Vehicle Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Electric Vehicle Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Electric Vehicle Charging Station?
- Hyundai EV Charging Station, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.
