Metis N4 Construction EV Charging Station, 2000 Portage Ave, Winnipeg, MB
Metis N4 Construction is an EV charging location at 2000 Portage Ave, Winnipeg, Manitoba, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
Where Metis N4 Construction is
2000 Portage Ave, Winnipeg, MB, R3J 0K1
| Field | Value |
|---|---|
| Street | 2000 Portage Ave |
| City | Winnipeg |
| Province | Manitoba |
| Coordinates | 55.74010, -97.86200 |
Connectors and power at Metis N4 Construction
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Metis N4 Construction
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Metis N4 Construction
4 other charging locations are mapped within 5 km of Metis N4 Construction, 4 of them with DC fast charging. Metis N4 Construction has no DC fast charging recorded; the closest location that does is FLO Charging Station, 1.0 km north.
Metis N4 Construction is one of 120 charging locations Zevvy has mapped in Winnipeg; 30 of them have DC fast charging. 67 locations in Winnipeg have a higher recorded output than its 3.7 kW.
Which cars can charge at Metis N4 Construction
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Metis N4 Construction, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Metis N4 Construction
- FLO Charging Station226 Mystery Lake Rd, Thompson, MB R8N 1S6, Canada1.0 km away · north
- FLO Charging Station40 Station Rd, Thompson, MB R8N 0N4, Canada1.1 km away · east
- Eco-West Canada294 Thompson Dr N, Thompson, MB, R8N 0C41.1 km away · north
- FLO Charging Station121 Nelson Rd, Thompson, MB R8N 0B7, Canada1.4 km away · east
- Noodoe Charging Station1 Airport Rd, Mystery Lake, MB R0B, Canada6.4 km away · north
Plan a trip through Winnipeg
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Metis N4 Construction working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Metis N4 Construction have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Metis N4 Construction a fast charger?
- No. Only AC charging is recorded at Metis N4 Construction, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is FLO Charging Station, 1.0 km away.
- How long does it take to charge at Metis N4 Construction?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Metis N4 Construction?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Metis N4 Construction?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Metis N4 Construction?
- FLO Charging Station, 1.0 km away, with CHAdeMO and CCS1. 4 further alternatives are listed on this page.
