ChargePoint Charging Station, 75 Mill Hill Rd, Woodstock, NY
ChargePoint Charging Station is an EV charging location at 75 Mill Hill Rd, Woodstock, New York, with J1772 (Type 1) across 1 charge point rated up to 6.5 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output6.5 kW
- Google rating2.3 of 5
Where ChargePoint Charging Station is
75 Mill Hill Rd, Woodstock, NY 12498, USA
| Field | Value |
|---|---|
| Street | 75 Mill Hill Rd |
| City | Woodstock |
| State | New York |
| ZIP code | 12498 |
| Coordinates | 42.03897, -74.11305 |
Connectors and power at ChargePoint Charging Station
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 6.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
Which cars can charge at ChargePoint Charging Station
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Reported status and reviews
Zevvy records no independently verified working status for any charger in this dataset, and does not publish one it cannot stand behind. Google users rate ChargePoint Charging Station 2.3 out of 5 from 3 reviews.
What drivers have written
“I wish they had put in a 7.2 or even 11 kW charger (instead of 5.5) at a place where you park for relatively short periods, but I’m very glad they have a chargepoint here. I wish every grocery store did.. it makes doing chores in a plug in vehicle into a two for one stop” — J P, 5 years ago
“The charge is insanely slow. Avoid at all costs” — Adam Bresnick, a year ago
“Not working when I was there, and no information to indicate why or when it may work in the future.” — David B. Alexander, a month ago
Nearest alternative chargers to ChargePoint Charging Station
- ChargePoint Charging Station56 Rock City Rd, Woodstock, NY 12498, USA0.5 mi away · north-west
- ViaLynk Charging Station295 NY-375, West Hurley, NY 12491, USA2.3 mi away · south
- ViaLynk Charging Station149 Blue Mountain Rd, Saugerties, NY 12477, USA5.8 mi away · north-east
- Applegreen Fast Charge Charging Station for EVI-87 Southbound Mile Post 96 Between: Exit 20 (Saugerties) & Exit 19 (Kingston, Ruby, NY 12475, USA6.1 mi away · east
- ViaLynk Charging Station149 Blue Mountain Rd, Saugerties, NY 12477, USA6.1 mi away · north-east
Plan a trip through Woodstock
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is ChargePoint Charging Station working right now?
- Zevvy does not hold a verified live status for this charger, so we do not claim one. Google users rate it 2.3 out of 5 from 3 reviews, which is a signal about the site rather than about the bay being free today. Check the live planner before you rely on it, and see the alternatives listed on this page.
- What connectors does ChargePoint Charging Station have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 6.5 kW.
- How much does it cost to charge at ChargePoint Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at ChargePoint Charging Station?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to ChargePoint Charging Station?
- ChargePoint Charging Station, 0.5 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.