Zevvy Plan a route

Charge Grid Charging Station, Jyoto Filling Station, Yeshwantnagar

Charge Grid Charging Station is an EV charging location at Jyoto Filling Station, Yeshwantnagar, Madhya Pradesh, with Type 2 AC across 1 charge point rated up to 7.4 kW.

Where Charge Grid Charging Station is

AH47, A.B. Road Nh-52 (Old Nh-3), Tehsil Tarana, Village Nainavad, District Ujjain (M.P.), Jyoto Filling Station, Yeshwantnagar,येश्वन्त्नगर, Yeshwantnagar, Madhya Pradesh 465001, India

Location detail for Charge Grid Charging Station
FieldValue
LocalityJyoto Filling Station
CityYeshwantnagar
StateMadhya Pradesh
Coordinates23.37953, 76.23098

Connectors and power at Charge Grid Charging Station

Connector types recorded at Charge Grid Charging Station
ConnectorCurrentTypical use
Type 2 ACACSlower top-up over a longer stay

The highest output recorded for this location is 7.4 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Charge Grid Charging Station

Time to take a battery from 10 to 80 per cent at the 7.4 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 7.4 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Charge Grid Charging Station
Battery sizeEnergy addedMinimum time
30 kWh21 kWh2 hr 50 min
45 kWh31.5 kWh4 hr 15 min
60 kWh42 kWh5 hr 40 min

Charging around Charge Grid Charging Station

1 other charging location is mapped within 5 km of Charge Grid Charging Station, 1 of them with DC fast charging. Charge Grid Charging Station has no DC fast charging recorded; the closest location that does is Hindustan Petroleum Corporation Limited Charging Station, 0.0 km south-west.

Charge Grid Charging Station is one of 2 charging locations Zevvy has mapped in Yeshwantnagar; 1 of them has DC fast charging. 1 location in Yeshwantnagar has a higher recorded output than its 7.4 kW.

Which cars can charge at Charge Grid Charging Station

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at Charge Grid Charging Station
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
Mahindra eVerito140 kmType 2 AC
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2

Is it working?

Zevvy has no live status for Charge Grid Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Charge Grid Charging Station

Plan a trip through Yeshwantnagar

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Charge Grid Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Charge Grid Charging Station have?
Type 2 AC (AC) across 1 charge point, rated up to 7.4 kW.
Is Charge Grid Charging Station a fast charger?
No. Only AC charging is recorded at Charge Grid Charging Station, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Hindustan Petroleum Corporation Limited Charging Station, 0.0 km away.
How long does it take to charge at Charge Grid Charging Station?
At its rated 7.4 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 4 hr 15 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at Charge Grid Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Charge Grid Charging Station?
Any car with Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total. This is an AC-only location, so charging will be slow.
What is the nearest alternative to Charge Grid Charging Station?
Hindustan Petroleum Corporation Limited Charging Station, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.

More charging near Charge Grid Charging Station