Kia India Training Center EV Charging Station, Virgonagar, Bengaluru, Karnataka
Kia India Training Center is a Tata Power charging location at Virgonagar, Bengaluru, Karnataka, with CCS2 across 1 charge point rated up to 150 kW.
- ConnectorsCCS2
- Charge points1
- Rated output150 kW
- NetworkTata Power
Where Kia India Training Center is
Budigere Road, Virgonagar, Bengaluru, Karnataka, 560049
| Field | Value |
|---|---|
| Locality | Virgonagar |
| City | Bengaluru |
| State | Karnataka |
| PIN code | 560049 |
| Coordinates | 13.05242, 77.74675 |
| From Bengaluru centre | 18.8 km north-east |
| Network operator | Tata Power |
Connectors and power at Kia India Training Center
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 150 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Kia India Training Center
Time to take a battery from 10 to 80 per cent at the 150 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 150 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 8 min |
| 45 kWh | 31.5 kWh | 13 min |
| 60 kWh | 42 kWh | 17 min |
Charging around Kia India Training Center
8 other charging locations are mapped within 5 km of Kia India Training Center, 8 of them with DC fast charging.
Kia India Training Center is one of 339 charging locations Zevvy has mapped in Bengaluru, and one of 255 with DC fast charging. 7 locations in Bengaluru have a higher recorded output than its 150 kW.
Which cars can charge at Kia India Training Center
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Kia India Training Center, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Kia India Training Center
- Kia Charging StationKia India Private Limited , Sy. No. 122, (Old.11, Cross, Budigere Rd, off Old Madras Road, Virgonagar, Aavalahalli, Chimasandra, Karnataka 560049, India0.0 km away · south-east
- Shell Recharge Charging StationBudigere Rd Hosakote Cheemasandra, Vil, Bidarahal, Chimasandra, Karnataka 560049, India1.0 km away · north-west
- Shell Recharge BudigereBudigere Rd Hosakote, Cheemasandra, Karnataka, 5600491.2 km away · north
- Shell Recharge Charging StationOld Madras Rd, Hobli, East, Bidarahalli, Bengaluru, Karnataka 560049, India1.4 km away · south-west
- Jio-bp pulse Charging Station | Orion Uptown Mall7, Old Madras Rd, Sannatammanahalli, Huskur, Bengaluru, Karnataka 562129, India1.9 km away · east
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Kia India Training Center working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Kia India Training Center have?
- CCS2 (DC fast) across 1 charge point, rated up to 150 kW.
- Is Kia India Training Center a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 150 kW.
- How long does it take to charge at Kia India Training Center?
- At its rated 150 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 13 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Kia India Training Center?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Tata Power sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Kia India Training Center?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Kia India Training Center?
- Kia Charging Station, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.
