Verde Mobility Charging Station, Bengaluru, Karnataka
Verde Mobility Charging Station is an EV charging location at Bengaluru, Karnataka, with Type 2 AC across 2 charge points rated up to 7 kW.
- ConnectorsType 2 AC
- Charge points2
- Rated output7 kW
Where Verde Mobility Charging Station is
4th Floor, Kanha Capital, 409, above HDFC bank, opposite Express Hotel, Unknown IN, Alkapuri, Vadodara, Doddanagamangala Village, Gujarat 560099, India
| Field | Value |
|---|---|
| City | Bengaluru |
| State | Karnataka |
| Coordinates | 12.86277, 77.68466 |
| From Bengaluru centre | 15.5 km south-east |
Connectors and power at Verde Mobility Charging Station
| Connector | Current | Typical use |
|---|---|---|
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Verde Mobility Charging Station
Time to take a battery from 10 to 80 per cent at the 7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 3 hr |
| 45 kWh | 31.5 kWh | 4 hr 30 min |
| 60 kWh | 42 kWh | 6 hr |
Charging around Verde Mobility Charging Station
28 other charging locations are mapped within 5 km of Verde Mobility Charging Station, 19 of them with DC fast charging. Verde Mobility Charging Station has no DC fast charging recorded; the closest location that does is JioBP Pulse Charging Hub - Electronic City Phase II, 1.1 km west.
Verde Mobility Charging Station is one of 339 charging locations Zevvy has mapped in Bengaluru; 255 of them have DC fast charging. 306 locations in Bengaluru have a higher recorded output than its 7 kW.
Which cars can charge at Verde Mobility Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Verde Mobility Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Verde Mobility Charging Station
- JioBP Pulse Charging Hub - Electronic City Phase IISy No 62/1, Electronic City, Hobli, Begur, Bengaluru, Karnataka, 5601001.1 km away · west
- Charzer Charging StationRMXM+GF7, 5th Main Rd, Naidu Layout, Shanthipura, Phase II, Electronic City, Bhovi Palya, Karnataka 560099, India1.6 km away · south
- Charzer Charging StationVM2F+9HR, Konappana Agrahara, Electronic City, Konappana Agrahara, Karnataka 560100, India1.8 km away · south-west
- Tata Power Charging StationTata Power Solar, Electronic City Rd, Phase II, Electronic City, Bengaluru, Konappana Agrahara, Karnataka 560100, India1.9 km away · south-west
- Tata Power Charging StationProperty No 36/6, JSP AUTOCARE PVT LTD, Doddanagala Main Road, Doddanagamangala Village, Holbli, Begur, Doddanagamangala Village, Karnataka 560100, India1.9 km away · west
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Verde Mobility Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Verde Mobility Charging Station have?
- Type 2 AC (AC) across 2 charge points, rated up to 7 kW.
- Is Verde Mobility Charging Station a fast charger?
- No. Only AC charging is recorded at Verde Mobility Charging Station, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is JioBP Pulse Charging Hub - Electronic City Phase II, 1.1 km away.
- How long does it take to charge at Verde Mobility Charging Station?
- At its rated 7 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 4 hr 30 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Verde Mobility Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Verde Mobility Charging Station?
- Any car with Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total. This is an AC-only location, so charging will be slow.
- What is the nearest alternative to Verde Mobility Charging Station?
- JioBP Pulse Charging Hub - Electronic City Phase II, 1.1 km away, with CCS2, Type 2 AC, IEC 60309 industrial (3-pin) and GB/T DC. 4 further alternatives are listed on this page.
