JioBP Pulse Charging Hub - Electronic City Phase II, Begur, Bengaluru, Karnataka
JioBP Pulse Charging Hub - Electronic City Phase II is a JIO BP Pulse charging location at Begur, Bengaluru, Karnataka, with CCS2, Type 2 AC, IEC 60309 industrial (3-pin) and GB/T DC across 4 charge points rated up to 60 kW.
- ConnectorsCCS2, Type 2 AC, IEC 60309 industrial (3-pin), GB/T DC
- Charge points4
- Rated output60 kW
- NetworkJIO BP Pulse
Where JioBP Pulse Charging Hub - Electronic City Phase II is
Sy No 62/1, Electronic City, Hobli, Begur, Bengaluru, Karnataka, 560100
| Field | Value |
|---|---|
| Locality | Begur |
| City | Bengaluru |
| State | Karnataka |
| PIN code | 560100 |
| Coordinates | 12.86462, 77.67486 |
| From Bengaluru centre | 14.7 km south-east |
| Network operator | JIO BP Pulse |
Connectors and power at JioBP Pulse Charging Hub - Electronic City Phase II
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
| Type 2 AC | AC | Slower top-up over a longer stay |
| IEC 60309 industrial (3-pin) | AC | Slower top-up over a longer stay |
| GB/T DC | DC | Fast charging on a highway stop |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
Which cars can charge at JioBP Pulse Charging Hub - Electronic City Phase II
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Reported status and reviews
Zevvy records no independently verified working status for any charger in this dataset, and does not publish one it cannot stand behind. No rating or review data is recorded for JioBP Pulse Charging Hub - Electronic City Phase II.
Nearest alternative chargers to JioBP Pulse Charging Hub - Electronic City Phase II
- Tata Power Charging StationProperty No 36/6, JSP AUTOCARE PVT LTD, Doddanagala Main Road, Doddanagamangala Village, Holbli, Begur, Doddanagamangala Village, Karnataka 560100, India0.9 km away · west
- Verde Mobility Charging Station4th Floor, Kanha Capital, 409, above HDFC bank, opposite Express Hotel, Unknown IN, Alkapuri, Vadodara, Doddanagamangala Village, Gujarat 560099, India1.1 km away · east
- BPCL Charging StationVM38+8V4, Konappana Agrahara, Electronic City, Konappana Agrahara, Karnataka 560100, India1.5 km away · south-west
- Charzer Charging StationVM2F+9HR, Konappana Agrahara, Electronic City, Konappana Agrahara, Karnataka 560100, India1.5 km away · south
- Metro Cash&Carry5/2, NH - 44, Lavakusha Nagar, Bengaluru, Karnataka , 5601001.6 km away · west
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is JioBP Pulse Charging Hub - Electronic City Phase II working right now?
- Zevvy does not hold a verified live status for this charger, so we do not claim one. No rating or review data is recorded for it either. Check the live planner before you rely on it, and see the alternatives listed on this page.
- What connectors does JioBP Pulse Charging Hub - Electronic City Phase II have?
- CCS2 (DC fast), Type 2 AC (AC), IEC 60309 industrial (3-pin) (AC) and GB/T DC (DC fast) across 4 charge points, rated up to 60 kW.
- How much does it cost to charge at JioBP Pulse Charging Hub - Electronic City Phase II?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. JIO BP Pulse sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at JioBP Pulse Charging Hub - Electronic City Phase II?
- Any car with CCS2, Type 2 AC, IEC 60309 industrial (3-pin) and GB/T DC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to JioBP Pulse Charging Hub - Electronic City Phase II?
- Tata Power Charging Station, 0.9 km away, with CCS2. 4 further alternatives are listed on this page.