Zevvy Plan a route

Rushi bhaiya pump EV Charging Station, Shingoli

Rushi bhaiya pump is an EV charging location at Shingoli, Maharashtra, with CCS2 across 1 charge point rated up to 60 kW.

Where Rushi bhaiya pump is

727G+87, Shingoli, Maharashtra 413582, India

Location detail for Rushi bhaiya pump
FieldValue
CityShingoli
StateMaharashtra
Coordinates18.26331, 76.02571

Connectors and power at Rushi bhaiya pump

Connector types recorded at Rushi bhaiya pump
ConnectorCurrentTypical use
CCS2DCFast charging on a highway stop

The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Rushi bhaiya pump

Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Rushi bhaiya pump
Battery sizeEnergy addedMinimum time
30 kWh21 kWh21 min
45 kWh31.5 kWh31 min
60 kWh42 kWh42 min

Charging around Rushi bhaiya pump

2 other charging locations are mapped within 5 km of Rushi bhaiya pump, 2 of them with DC fast charging.

It is the only charging location Zevvy has mapped in Shingoli.

Which cars can charge at Rushi bhaiya pump

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at Rushi bhaiya pump
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2
MG Windsor EV332 kmCCS2

Is it working?

Zevvy has no live status for Rushi bhaiya pump, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Rushi bhaiya pump

Plan a trip through Shingoli

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Rushi bhaiya pump working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Rushi bhaiya pump have?
CCS2 (DC fast) across 1 charge point, rated up to 60 kW.
Is Rushi bhaiya pump a fast charger?
Yes. It has DC fast charging (CCS2), rated up to 60 kW.
How long does it take to charge at Rushi bhaiya pump?
At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Rushi bhaiya pump?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Rushi bhaiya pump?
Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
What is the nearest alternative to Rushi bhaiya pump?
Hindustan Petroleum Corporation Limited Charging Station, 1.9 km away, with CCS2. 4 further alternatives are listed on this page.

More charging near Rushi bhaiya pump