Zevvy Plan a route

EV Charging Stations from Cleveland to Pittsburgh

389 charging locations are mapped within 9 mi of the 133 mi drive from Cleveland, Ohio to Pittsburgh, Pennsylvania. Each charger is listed with its connectors, its rated output where we hold one, and how far along the route it sits.

How many charging stops you need, Cleveland to Pittsburgh

Stops are the number of times a car must add range to cover 133 mi, assuming 70% of rated range is usable between stops (the buffer that highway speeds, load and arrival reserve actually take). Formula: stops = ceil(133 / usable range) − 1.

Charging stops by rated range on the Cleveland–Pittsburgh route
Rated rangeUsable between stopsStops neededEnough chargers on route
150 mi105 mi1Yes — 94 DC locations mapped
200 mi140 mi0No stop needed
250 mi175 mi0No stop needed
300 mi210 mi0No stop needed

Chargers on the Cleveland to Pittsburgh corridor

Ordered by distance from Cleveland along the driving route, not in a straight line. “Off route” is the perpendicular distance from the road to the charger.

389 charging locations sit inside the corridor. The 94 with DC fast charging are listed here, because those are the stops that matter on a highway drive; the other 295 are counted in the tables on this page.

Connector availability on this corridor

Connector types across the 389 mapped locations between Cleveland and Pittsburgh
ConnectorCurrentLocationsShare of corridor
J1772 (Type 1)AC29576%
CCS1DC fast7018%
NACS (Tesla)AC and DC5715%
CHAdeMODC fast328%

Charging networks on this route

Operators recorded on the Cleveland–Pittsburgh corridor
NetworkLocations on route
Blink Charging8
ChargePoint4
flo4
AmpUp1
Electrify America1

Plan this trip with live charger data

Open the Cleveland to Pittsburgh route in Zevvy's planner to pick stops for your own car and starting charge.

Plan Cleveland to Pittsburgh

Frequently asked questions

How many EV charging stations are there between Cleveland and Pittsburgh?
Zevvy has 389 charging locations mapped within 9 mi of the 133 mi route. 94 locations have DC fast charging; the rest are AC or not recorded.
Can I drive from Cleveland to Pittsburgh in an EV?
Yes, on the chargers we have mapped. The longest stretch without a DC fast charger inside the 9 mi corridor is 26 mi, so a car that can cover that between stops can make the trip. Across the 150-300 mi range bands below, that works out at 0 to 1 charging stops.
What charging connectors are available on the Cleveland to Pittsburgh route?
J1772 (Type 1) at 295 locations, CCS1 at 70 locations, NACS (Tesla) at 57 locations and CHAdeMO at 32 locations. Each location is counted once per connector type it offers.
Where is the longest gap without a fast charger on the Cleveland to Pittsburgh drive?
It is the 26 mi stretch after ChargePoint Charging Station, before EV Connect Charging Station. Charge to cover at least that distance before entering it.
Which charging networks operate on the Cleveland to Pittsburgh route?
Blink Charging (8 locations), ChargePoint (4 locations), flo (4 locations), AmpUp (1 location) and Electrify America (1 location). The remaining 371 locations have no operator recorded in our dataset.
How long does the Cleveland to Pittsburgh drive take?
The routing engine puts the 133 mi drive at 2 hr 10 min of driving time, before any charging. Add the time for the charging stops your car needs from the table above.

Other routes from Cleveland and Pittsburgh